Skip to content
kliva
Malaysia Ultra-Trail by UTMB
UltraMalaysiaPerak

Malaysia Ultra-Trail by UTMB 2027

04.09 – 12.09.2027Taiping (Malaysia)
Build your race plan →

Pacing, fueling and crew sheet for the course you pick

Start line in

 

4 courses · 13.9–97.7 km8.6–60.7 mi · up to 6’143 m D+up to 20’154 ft D+

At a glance

Malaysia Ultra-Trail by UTMB 2027 takes place from Saturday 4 to Sunday 12 September 2027 in Taiping (Perak, Malaysia). 4 courses from 13.9 to 97.7 km.

Longest course: MY100, 97.7 km with 6’143 m D+ (63 m per km: very steep terrain). It has 11 aid stations and 4 cutoffs.

On Kliva, plan your pacing and nutrition for free, then send the plan to your watch.

Malaysia Ultra-Trail by UTMB® will be hosted in the small historical town of Taiping, located on the northwest of Peninsular Malaysia in the silver state of Perak.
From the organiser

4 courses

  1. 13.9km8.6mi

    382 m D+1’253 ft D+

    485 m D-1’591 ft D-

    avg 3%

    MY13

    04.09. 08:00 · 1 aid station

    No index
    GPX
  2. 26.6km16.5mi

    1’072 m D+3’517 ft D+

    1’734 m D-5’689 ft D-

    avg 4%

    MY25

    04.09. 07:00 · 2 aid stations

    UTMB Index 20K1
    GPX
  3. 54.5km33.9mi

    1’750 m D+5’741 ft D+

    2’277 m D-7’470 ft D-

    avg 3%

    MY50

    04.09. 05:00 · 6 aid stations

    UTMB Index 50K2
    GPX
  4. 97.7km60.7mi

    6’143 m D+20’154 ft D+

    5’554 m D-18’222 ft D-

    avg 6%

    MY100

    04.09. 05:00 · 11 aid stations

    UTMB Index 100K3
    GPX

Course analysis

97.7 km60.7 mi6’143 m D+20’154 ft D+

159effort kmⓘ97.7 km on the map · feels like 159 km60.7 mi on the map · feels like 159 km
D+
6’143 m20’154 ft
D−
5’554 m18’222 ft
Max alt.
1’371 m4’498 ft
Steepest
25%

Segments

Skip the map

Elevation profile: MY100

18 m – 1’371 m59 ft – 4’498 ft

Terrain

Aid station by aid station

Terrain, climb and cutoff between each aid station.

  1. Start → Angkasa (AS1) km 0 → 12.5km 0 → 7.8

    12.5 km7.8 mi · +1’307 m4’288 ft · −326 m1’070 ft

  2. Angkasa (AS1) → Maxwell Basecamp km 12.5 → 22.1km 7.8 → 13.7

    9.6 km6 mi · +258 m846 ft · −1’227 m4’026 ft

  3. Maxwell Basecamp → Tiger Temple km 22.1 → 29.6km 13.7 → 18.4

    7.6 km4.7 mi · +442 m1’450 ft · −378 m1’240 ft

  4. Tiger Temple → Spritzer Ecopark km 29.6 → 37.5km 18.4 → 23.3

    7.9 km4.9 mi · +320 m1’050 ft · −402 m1’319 ft

  5. Spritzer Ecopark → KTM Tunnel km 37.5 → 50.1km 23.3 → 31.1

    12.7 km7.9 mi · +566 m1’857 ft · −540 m1’772 ft

  6. KTM Tunnel → Changkat Ibol Junction km 50.1 → 62.6km 31.1 → 38.9

    12.5 km7.7 mi · +176 m577 ft · −183 m600 ft · Cutoff Sat 23:00

  7. Changkat Ibol Junction → U-turn Kuning Sari km 62.6 → 67km 38.9 → 41.6

    4.4 km2.7 mi · +332 m1’089 ft · −238 m781 ft

  8. U-turn Kuning Sari → Peak 300 km 67 → 72.1km 41.6 → 44.8

    5.1 km3.2 mi · +398 m1’306 ft · −244 m801 ft · Cutoff Sun 02:00

Elevation figures are measured by Kliva on the course trace. Cutoffs are the organiser's.

Race plan

Plan your race from start to finish.

Pacing, aid stations and fueling timed to your effort on Malaysia Ultra-Trail by UTMB, in one roadbook.

Includes this race's official aid stations and cutoff times.

Where to stay

Find a place to stay near Taiping for the race.

We may earn a commission if you book through this map, at no extra cost to you.

Spotted wrong info on this page? Tell us and we'll review it. Report it