Lake Toba by UTMB 2027
Pacing, fueling and crew sheet for the course you pick
Start line in
At a glance
Lake Toba by UTMB 2027 takes place from Saturday 12 to Friday 11 June 2027 in Tuktuk Siadong (North Sumatra, Indonesia). 4 courses from 17.2 to 102.1 km.
Longest course: 102.1 km with 4’277 m D+ (42 m per km: mountain terrain). It has 10 aid stations and 3 cutoffs. Terrain: 23% trail, 13% forest track and 56% road. Terrain data: © OpenStreetMap contributors.
On Kliva, plan your pacing and nutrition for free, then send the plan to your watch.
4 courses
17.2km10.7mi
463 m D+1’519 ft D+
564 m D-1’850 ft D-
avg 3%
Legacy Dash 17K12.06. 07:00 · 2 aid stations
No index25.5km15.8mi
1’331 m D+4’367 ft D+
1’402 m D-4’600 ft D-
avg 5%
King's Ascent 25K12.06. 06:30 · 2 aid stations
No index65.9km40.9mi
3’183 m D+10’443 ft D+
3’310 m D-10’860 ft D-
avg 5%
65.9km12.06. 06:00 · 8 aid stations
102.1km63.4mi
4’277 m D+14’032 ft D+
4’270 m D-14’009 ft D-
avg 4%
104.5km12.06. 03:00 · 10 aid stations
Course analysis
The course
A 17.2 km course with 463 m of climbing, between 901 m and 1’300 m.
The main climb comes early: from km 0 to km 6.9, +298 m up to 1’108 m, with the steepest pitch around 12%. The rest of the climbing comes in 1 shorter climb.
Cutoffs: km 17.2 at Sat 11:15.
The course
A 25.5 km course with 1’331 m of climbing, 31% off-road: 31% path and 60% road.
The main climb comes in the middle: from km 10.1 to km 12.9, +632 m up to 1’957 m, with the steepest pitch around 22%. The rest of the climbing comes in 4 shorter climbs.
Cutoffs: km 25.5 at Sat 15:30.
The course
A 65.9 km course with 3’183 m of climbing, 47% off-road: 37% path, 10% forest track and 50% road.
The main climb comes early: from km 9 to km 12.9, +737 m up to 1’961 m, the high point, with the steepest pitch around 19%. The rest of the climbing comes in 8 shorter climbs.
Cutoffs: km 33.9 at Sat 18:00 and km 64.9 at Sun 02:00.
The course
A 102.1 km course with 4’277 m of climbing, 36% off-road: 23% path, 13% forest track and 56% road.
The main climb comes in the middle: from km 46.1 to km 50, +738 m up to 1’962 m, the high point, with the steepest pitch around 20%. The rest of the climbing comes in 10 shorter climbs.
Cutoffs: km 63.1 at Sat 22:00, km 71.1 at Sun 00:30 and km 102.1 at Sun 09:00.
102.1 km63.4 mi4’277 m D+14’032 ft D+
- D+
- 4’277 m14’032 ft
- D−
- 4’270 m14’009 ft
- Max alt.
- 1’962 m6’437 ft
- Steepest
- 20%
Segments
Elevation profile: 104.5km
902 m – 1’962 m2’959 ft – 6’437 ft
Terrain
Aid station by aid station
Terrain, climb and cutoff between each aid station.
Start → Paraduan km 0 → 9.2km 0 → 5.7
9.2 km5.7 mi · +379 m1’243 ft · −99 m325 ft
Paraduan → Ronggur Nihuta km 9.2 → 21km 5.7 → 13
11.8 km7.3 mi · +452 m1’483 ft · −115 m377 ft
Ronggur Nihuta → Huta Tinggi km 21 → 34km 13 → 21.1
13 km8.1 mi · +134 m440 ft · −471 m1’545 ft
Huta Tinggi → Sitao-tao km 34 → 45.7km 21.1 → 28.4
11.8 km7.3 mi · +458 m1’503 ft · −411 m1’348 ft
Sitao-tao → Pusuk Buhit km 45.7 → 50.2km 28.4 → 31.2
4.5 km2.8 mi · +738 m2’421 ft · −55 m180 ft
Pusuk Buhit → Geopark Information Center km 50.2 → 57.1km 31.2 → 35.5
6.9 km4.3 mi · +19 m62 ft · −709 m2’326 ft
Geopark Information Center → SMAN 1 Sianjur Mulamula km 57.1 → 63.1km 35.5 → 39.2
6 km3.7 mi · +182 m597 ft · −290 m951 ft · Cutoff Sat 22:00
SMAN 1 Sianjur Mulamula → Ginolat km 63.1 → 71.1km 39.2 → 44.2
8 km5 mi · +615 m2’018 ft · −695 m2’280 ft · Cutoff Sun 00:30
Ginolat → Bonan Dolok km 71.1 → 83.2km 44.2 → 51.7
12.1 km7.5 mi · +771 m2’530 ft · −824 m2’703 ft
Bonan Dolok → Bukit Burung km 83.2 → 93.9km 51.7 → 58.4
10.7 km6.7 mi · +388 m1’273 ft · −427 m1’401 ft
Bukit Burung → Finish km 93.9 → 102.1km 58.4 → 63.4
8.2 km5.1 mi · +134 m440 ft · −175 m574 ft · Cutoff Sun 09:00
Elevation figures are measured by Kliva on the course trace. Cutoffs are the organiser's.
Aid station by aid station
Terrain, climb and cutoff between each aid station.
Start → Lumban Simalango km 0 → 3km 0 → 1.9
3 km1.9 mi · +212 m696 ft · −7 m23 ft
Lumban Simalango → Huta Tinggi km 3 → 11.2km 1.9 → 7
8.3 km5.1 mi · +296 m971 ft · −223 m732 ft
Huta Tinggi → Finish km 11.2 → 17.2km 7 → 10.7
6 km3.7 mi · +54 m177 ft · −335 m1’099 ft · Cutoff Sat 11:15
Elevation figures are measured by Kliva on the course trace. Cutoffs are the organiser's.
Aid station by aid station
Terrain, climb and cutoff between each aid station.
Start → Sitao-tao km 0 → 8.6km 0 → 5.3
8.6 km5.3 mi · +431 m1’414 ft · −98 m322 ft
Sitao-tao → Rumah Hela Parking km 8.6 → 17.6km 5.3 → 11
9.1 km5.6 mi · +913 m2’995 ft · −851 m2’792 ft
Rumah Hela Parking → Finish km 17.6 → 25.5km 11 → 15.8
7.9 km4.9 mi · +58 m190 ft · −453 m1’486 ft · Cutoff Sat 15:30
Elevation figures are measured by Kliva on the course trace. Cutoffs are the organiser's.
Aid station by aid station
Terrain, climb and cutoff between each aid station.
Start → Sitao-tao km 0 → 8.6km 0 → 5.3
8.6 km5.3 mi · +431 m1’414 ft · −98 m322 ft
Sitao-tao → Pusuk Buhit km 8.6 → 13km 5.3 → 8.1
4.5 km2.8 mi · +737 m2’418 ft · −43 m141 ft
Pusuk Buhit → Geopark Information Center km 13 → 19.9km 8.1 → 12.4
6.9 km4.3 mi · +25 m82 ft · −733 m2’405 ft
Geopark Information Center → SMAN 1 Sianjur Mula Mula km 19.9 → 25.9km 12.4 → 16.1
6 km3.7 mi · +183 m600 ft · −288 m945 ft
SMAN 1 Sianjur Mula Mula → Ginolat km 25.9 → 33.9km 16.1 → 21.1
8 km5 mi · +627 m2’057 ft · −708 m2’323 ft · Cutoff Sat 18:00
Ginolat → Bonan Dolok km 33.9 → 46km 21.1 → 28.6
12.1 km7.5 mi · +777 m2’549 ft · −837 m2’746 ft
Bonan Dolok → Bukit Burung km 46 → 56.8km 28.6 → 35.3
10.7 km6.7 mi · +404 m1’325 ft · −434 m1’424 ft
Bukit Burung → Finish km 56.8 → 64.9km 35.3 → 40.3
8.1 km5.1 mi · +125 m410 ft · −169 m554 ft · Cutoff Sun 02:00
Finish → Finish km 64.9 → 65.9km 40.3 → 40.9
1 km0.6 mi · +0 m0 ft · −0 m0 ft
Elevation figures are measured by Kliva on the course trace. Cutoffs are the organiser's.
Feels like these
- TransJeju by UTMB102.8 km63.9 mi · 144 km-effortOct 1, 2027 · Dates to be confirmed4’479 km away2’783.1 mi away
- Pirin Ultra68.1 km42.3 mi · 126 km-effortSep 9, 20278’601 km away5’344.4 mi away
- Istria 100 by UTMB®️110.7 km68.8 mi · 151 km-effortApr 1, 2027 · Dates to be confirmed9’384 km away5’830.9 mi away
- Dolomiti Extreme Trail74.3 km46.2 mi · 133 km-effortJun 11, 20279’540 km away5’927.9 mi away
Where to stay
Find a place to stay near Tuktuk Siadong for the race.
We may earn a commission if you book through this map, at no extra cost to you.
Spotted wrong info on this page? Tell us and we'll review it. Report it